- Letter from BOS to ZBA - Upton Apartments 40B - May 7, 2024.pdf
- Fire-EMS Review - Comments - 5-15-24.pdf
- 47 Main Street Water and Sewer Design Peer Review Memo.pdf
- Historical Commission Comments - Revised 4-10-24.pdf
- Letter from Select Board - Attorney Hill Review - July 11, 2024.pdf
- Ltr. ZBA 7.16.24 D Hill Response.pdf
- Atty Alphen Memo to Board re Hill Letter 7.16.pdf
Application Materials
- J-16 - 47 Main St - Sh 0-4_opt.pdf
- J-16 - 47 Main St - Sh 5-7.3_opt.pdf
- J-16 - 47 Main St - Sh 7.4-9.2_opt.pdf
- J-16 - 47 Main St - Sh 10.1-10.2_opt.pdf
- Tab 0- TABLE OF CONTENTS Comprehensive Permit Application.pdf
- Tab 1- Board Of Appeals Application Form.pdf
- Tab 2- Narrative Description of Design Approach.pdf
- Tab 3- PEL- Upton Apartments.pdf
- Tab 4- Purchase and Sale Agreement and First Amendment.pdf
- Tab 5- Limited Dividend Entity Status.pdf
- Tab 6-Development Team.pdf
- Tab 7- Assessor's Tax Map.pdf
- Tab 7- J-16 MAIN ST UPTON ariel photo existing.pdf
- Tab 7- J-16 MAIN ST UPTON ariel photo with site plan.pdf
- Tab 8- Stamped Drainage Report-9-13-23_opt.pdf
- Tab 8-Stamped Drainage Maps_opt.pdf
- Tab 9- Tabulation of Proposed Buildings.pdf
- Tab 10- Existing Site Conditions.pdf
- Tab 10-Recorded ORAD_Order of Resource Area Delineation_4_28_23.pdf
- Tab 11- Site and Context Photos Maps Link_4_28_23.pdf
- Tab 12- Preliminary Architectural Plans Upton Apartments_Comprehensive Permit App.pdf
- Tab 13-Requested Waiver List_Final.pdf
- Tab 14- Transportation Impact Assessment (TIA) 06.15.23.pdf
- Tab 15- Certified Abutters List.pdf
Revised Materials submitted
- DA MAPS Scan 2024-1-8 (11,43,11)_opt.pdf
- pipe sizing calcualtions.pdf
- Response Letter 1-8-24.pdf
- TRUCK SIM PLAN Scan 2024-1-8 (11,42,34)_opt.pdf
- 47 Main St - Drainage Report 1-8-24_reduced size.pdf
- PLAN SET 1-8-24 Scan 2024-1-8 (11,32,41)_opt_reduced size-part-1.pdf
- PLAN SET 1-8-24 Scan 2024-1-8 (11,32,41)_opt_reduced size-part-2.pdf
- PLAN SET 1-8-24 Scan 2024-1-8 (11,32,41)_opt_reduced size-part-3.pdf
- J-16 47 MAIN ST - SECOND REV 2-20-24.pdf
- J-016 - REVISED PLANS 2-20-24.pdf
- j-016 final plan set for zba meetin 2-21-24.pdf
- j-16 Report 4-4-24.pdf
- j-16 revised pipe cal 4-4-24.pdf
- J-16-47 Main St - revision eliminate lower level- Stamped - 4-3-24_Part1.pdf
- J-16-47 Main St - revision eliminate lower level- Stamped - 4-3-24_Part2.pdf
- J-16-47 Main St - revision eliminate lower level- Stamped - 4-3-24_Part3.pdf
- J-16 MAIN ST UPTON DESIGN PLAN R3 cb -da.pdf
- J-16 MAIN ST UPTON DESIGN PLAN R3 pre-development.pdf
- J-16 MAIN ST UPTON DESIGN PLAN R3 post development.pdf
- J-016 - Main Street Upton revised 6-24 R_Part1_opt.pdf
- J-016 - Main Street Upton revised 6-24 R_Part2_opt.pdf
- J-016 - Main Street Upton revised 6-24 R_Part3.pdf
- J-016 - Main Street Upton revised 6-24 R_Part4.pdf
- Upton Apartments_ZBA Final Revisions_06.28.2024 - Section 1
- Upton Apartments_ZBA Final Revisions_06.28.2024 - Section 3.pdf
- Upton Apartments_ZBA Final Revisions_06.28.2024 - Section 2.pdf
- Final Set 7-17-24 R_Part1
- Final Set 7-17-24 R_Part2
- Final Set 7-17-24 R_Part3
Revised Plan Set 5-19-24
- 47 Main St 5-20 plan_Part1.pdf
- 47 Main St 5-20 plan_Part2.pdf
- 47 Main St 5-20 plan_Part3.pdf
- 47 Main St 5-20 plan_Part4.pdf
- 47 Main St 5-20 plan_Part5.pdf
- 47 Main St 5-20 plan_Part6.pdf
- 47 Main St 5-20 plan_Part7.pdf
- 47 Main St 5-20 plan_Part8.pdf
- 47 Main St 5-20 plan_Part9.pdf
- 47 Main St 5-20 plan_Part10.pdf
- 47 Main St 5-20 plan_Part11.pdf
- 47 Main St 5-20 plan_Part12.pdf
- 47 Main St 5-20 plan_Part13.pdf
- 47 Main St 5-20 plan_Part14.pdf
- 47 Main St 5-20 plan_Part15.pdf
- 47 Main St 5-20 plan_Part16.pdf
- 47 Main St 5-20 plan_Part17.pdf
- 47 Main St 5-20 plan_Part18.pdf
- 47 Main St 5-20 plan_Part19.pdf
- Upton Apts - Elevations - 3-18-24.PDF
- Upton Apts - Architectural Rendering 3-18-24.PDF
Supplemental Documents
- 40B Presentation by Chris Alphen BBH Law.pptx
- Comments on Sewer and Water - Dan Lazarz 1-4-2023.pdf
- Lobisser -Engineering Presentation Slides for 10-18-23 Meeting.pdf
- Lobisser - Upton - ZBA Architectural Presentation_10.18.2023.pdf
- U5011-01-05_PS_Pump_Station_Evaluation_Report_Final.pdf
- Light Plan - Layout & Specs - Revised.pdf
- 47 Main St Traffic Presentation 11.15.23.pdf
- 47 Main St Traffic Profile 11.22.23.pdf
- 47 Main Street RTC 01.26.24.pdf
- J-16 Reduced R2 - Traffic.pdf
- Main Street Updated TIA 01.26.24 (1).pdf
- MHC_Upton Apartments_Upton MA_9_26_23.pdf
- MHC PNF Result.pdf
- 47 MainSt_Stantec Traffic Peer Review submittal_2023-11-09.pdf
- 47 Main Street_40B Application Civil_Stormwater Review_12152023.pdf
- 47MainSt_Stantc Traffic Peer Review _2024-02-16.pdf
- 47MainSt_Stantc Traffic Peer Review _2024-02-16.pdf
- 47 Main Street_40B Application Civil_Stormwater Review_02-16-2024.pdf
- 47 Main Street_40B Application Site Plan Review_03-20-2024.pdf
- Stantec Letter 4-8.pdf
- 47 Main Street_40B Application Site Plan Review_05-03-2024.pdf
- 47 Main Street_40B Application Site Plan Review_06-17-2024.pdf
- D&L Traffic Response 2-2-24.pdf
- Lobisser response 4-3-24 to Fire - EMS Comments.pdf
- Letter to Applicant_Outstanding issues 4-8-24.pdf
- Letter - MassHistoric to TM - April 3, 2024.pdf
- Stantec Status report 4-5-24.pdf
- Lobisser - Request to extend public hearing 5-20-24.pdf
- Hydraulic-Hydrologic calculations D and L Design Group report scanned and stamped 5-21-24.pdf
- Responses 5-28-24 to Stantec Review Letter 5-3-24.pdf
- Memo_147 Main Supplemental Communications with Neighbors and Project Modifications_6_7_24 .pdf
- Waiver List - Rev.5.10.24.pdf
- W Andrews - Comments on Draft Decision Notes.pdf
- Response to DPW Comments 6.25.24.docx
- Bob Humes - Mullins Certificate.pdf
Public Comment Submitted
- Hurley - 9-28-23.pdf
- M Kasilowski email 9-27-23.pdf
- Mary Ellen Kennedy 10-16-23.pdf
- P Norton Comments.pdf
- Pat Hurley - Comments 10-18-23.pdf
- Pickering Funeral Home 40B Concerns Letter 06052023.pdf
- Presentation - Public Comment by Marcia Kasilowski.pdf
- David Seligman - abutter concerns 10-23-23.pdf
- Meyer Comments 11-15-23.pdf
- Mike Penko - 11-25-23.pdf
- Pat Hurley - 12-20-23.pdf
- Mary Ellen Kennedy 1-11-24.pdf
- Kevin McLaughlin - 52 Main Street culvert and drainage 1-18-24.pdf
- Richard McGuire - 1-29-24 Letter to Upton Zoning Board.pdf
- R.McGuire 1-29-24 - 2.45_upton_center_historic_district_plan_4_28_23 (1).pdf
- 52 Main Street - K. McLaughlin 2-2-24.msg
- 52 Main Street - K. McLaughlin 2-9-24.msg
- Drainage on to 140 - Highlighted by K. McLaughlin - 52 Main - 2-9-24.pdf
- RE 52 Main Street - K. McLaughlin 2-9-24 2nd Email.msg
- K McLaughlin - Annotated documents 2-21-24.pdf
- James Meyer_Traffic Comments_02212024.pdf
- K McLaughlin - Public Comment 2-21-24.pdf
- R. McGuire 2-29-24 -Letter to Historical Commission.pdf
- 2.45_upton_center_historic_district_plan_4_28_23 (3).pdf
- R. McGuire - 3-6-24 - Summary of Lobbisser Meeting for the Upton Zoning Board.pdf
- R. McGuire 3-6-24 Height_47_Main_St.pdf
- K. McLaughlin 3-21-24 to Stantec - Omitted Catch Basin.pdf
- Letter to ZBA re Traffic concerns (April 29, 2024) - Submitted.docx
- L. Gay - 5-15-24 Upton Narrative to Counter Lobisser Construction.pdf
- L. Gay 15th Print oldest map with factory.pdf
- L. Gay 5-15-24CT Path with Color trails.png
- R. McGuire Concerning Storm Water Management 5-22-24.pdf
- LaCasse - memo on agreements comment 6-20-24.pdf
- C Weinfuss - 6-21-24 Topo Maps comments.pdf
- C Weinfuss - 6-21-24 Topo Maps 1.png
- C Weinfuss - 6-21-24 Topo Maps 2.png
- C Weinfuss - 6-21-24 Topo Maps 3.png
- C Weinfuss - Stormwater Infrastructure Near 47 Main Street - 7-3-24.pdf
- Melinda Martin Animal_Presentation_7-9-2024.pptx
- Pickering - 7-10-24 -24-0269 V-900 sketch 2024-07-10 Pickering FH Prop.pdf
- Pickering FH and 47 Main Street Water Runoff Concern Letter.pdf
- Linday Gay - Email 7-10-24 - attachment - 710 Upton's National Heritage Sites.pdf
- Linday Gay - Email 7-10-24 - attachment -710 HISTORIC PERSPECTIVE AND CONTEXT.pdf
- Linday Gay - Email 7-10-24 - attachment 710 Lobissers Narrative Description wresponse.pdf
- Linday Gay - Email 7-10-24 - attachment -STRAW FACTORY.PNG
- Linday Gay - Email Attachement - 710 Macris Data w Detailed Historic District vs 47 Main.pdf
- Linday Gay - Email 7-10-24 - attcahment MACRIS 2 of 2 with Historic District spreadsheet.numbers
- Linday Gay - Email 7-10-24 - attachment -710 Upton's Archeological Artifacts.pdf
- Linday Gay - Email 7-10-24_redacted.pdf
- K. McLaughlin re ConCom meeting 7-11-24 Email.pdf
- R. McGuire 7-14-24 Comment on Peer Review NOI 47 Main.pdf
- LaCasse - Request to Deny Comprehensive Permit - 7-16-24.pdf
Minutes and Exhibits
- ZBA Minutes 10-18-23.pdf
- Minutes Exhibit A - Attendance.pdf
- Minutes - Exhibit B - Online Attendees.pdf
- Minutes - Exhibit C - 40 B Process - C. Alphen.pdf
- Minutes - Exhibit D - K. Lobisser presentation.pdf
- Minutes - Exhibit E - Site review - P. Lavoie.pdf
- Minutes - Exhibit F - buiding plan review - J. Baldwin.pdf
- Minutes - Exhibit G - Stantec peer review agreement.pdf
- Minutes - Exhibit H - M. Kasilowski presentation.pdf
- ZBA Minutes 11-15-23.pdf
- Exhibit I.pdf
- Exhibit J.pdf
- Exhibit K.pdf
- Exhibit L.pdf
- Exhibit M.pdf
- ZBA Minutes 12-20-23.pdf
- Exhibit N - Sign in sheet.pdf
- Exhibit O Teams Screen shot - 12-20-23.docx
- Exhibit P - Request for continuance 1-16-24.pdf
- ZBA Minutes 1-17-24 .pdf
- ZBA Minutes 2-21-24.pdf
- Exhibit Q - Sign in Sheet 2-21-24.pdf
- Exhibit R - Screenshot Teams - Attendees 2-21-24.pdf
- Exhibit S - Revised Traffic Study -.pdf
- Exhibit T - Stantec Peer Review 2-16-24 E. Drew.pdf
- Exhibit U - D & L Design Group Response to Stormwater review 2-20-24.pdf
- Exhibit V - Stantec Stormwater Review 2-16-24.pdf
- Exhibit W - Meeting sign in sheet 3-20-24.pdf
- Exhibit X - Teams attendance screen shot 3-20-24.pdf
- Exhibit Y - Lobisser Presentation - 47 Main St 3-20.pdf
- Exhibit Z - 5-15-24 Sign In Sheet.pdf
- Exhibit AA - Screen shot teams attendees 5-15-24.docx
- Exhibit BB - 47 Main 40B Application Site Plan Review 5-3-24.pdf
- Exhibit CC - L. Gay comment and submission.pdf
- Exhibit DD - 6-20-24 Sign in sheet and teams attendance screen shot.pdf
Public Hearing Deadlines:
Application Date: 9/15/2023
Date of Meeting: 10/18/2023
Public Hearing Deadline: 10/15/23 = Date of Filing + 30 Days;
10/18/23 - Extended by Applicant
Close of Public Hearing: 4/15/2024 = Date of Hearing + 180 Days
5/15/2024 - extended by applicant
6/20/2024 - extended by applicant
7/17/2024 - Public Hearing closed by vote of the board
Decision Deadline: 40 Days After close of Public Hearing;
Assuming 5/15/24 is the last Public Hearing the deadline date will be:
June 24, 2024– Must be filed with Town Clerk’s Office
July 30, 2024 - Must be filed with Town Clerk's Office
August 23, 2024 - Date decision filed with Town Clerk's Office
Deadline to Appeal Decision: September 12, 2024